5.0 Installation
29
5.18 Making the Electrical Connections
1. Remove the cover from the control box by
removing the 2 screws (Fig. 72).
2. Slide the box forward for easier access.
3. The terminal strips may be removed by
carefully pulling them forward. Connect the supply
cable and the pump cable to the terminal strips
(Fig. 74).
IMPORTANT - When installing in conjunction
with a thermal store or heat store please refer
to the store manufacturers installation
instructions when wiring the boiler.
4. The pump must be connected to the boiler
terminals.
5. A permanent live must be connected to the 'L'
terminal.
6. The switched live must be connected to the
'S/L' terminal.
7. Clamp the cables in the grips provided. Ensure
that the lengths of the supply cables are such that
the current carrying wires become taut before the
earth wires if the cable should pull out of the cable
clamp (Fig. 73).
8. Tuck the cables under the box and clip to the
wall where necessary. Make sure sufficient slack
is left to allow the box to slide forward for future
access.
9. A cable clip is provided in the base of the box.
Switched Live
Permanent Live
Neutral
Earth
Pump Earth
Pump Neutral
Pump Live
Fig. 72
Fig. 73
Fig. 74
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 43 44

Comments to this Manuals

No comments