10.0 Completion
24
10.1 Completion
1. Hinge the facia panel upwards and refit the
case front panel. Secure them with the screws
previously removed (Fig. 45).
2. Instruct the user in the operation of the boiler
and system, explaining the operational sequence.
3. Carefully read and complete all sections of the
“Benchmark” Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user
for safe keeping and each subsequent regular
service visit recorded.
4. Hand over the Users Operating, Installation
and Servicing Instructions and the Log Book,
giving advice on the necessity of regular
servicing.