Baxi Eco 3 Service Manual

Browse online or download Service Manual for Water heaters & boilers Baxi Eco 3. Baxi Eco 3 Technical data [en] User Manual

  • Download
  • Add to my manuals
  • Print

Summary of Contents

Page 1 - Baxi Combi 80Eco

Baxi Combi 80Eco Gas Fired Wall Mounted Combination BoilerInstallation and Servicing InstructionsPlease leave these instructions with the user

Page 2 - Natural Gas

StopValveDoubleCheckValveDHWMainsInletCHReturnTemporaryHose6.0 System Details106.5 System Filling and Pressurising1. A filling point connection on the

Page 3 - Contents

6.0 System Details116.8 Domestic Hot Water Circuit1. All DHW circuits, connections, fittings, etc.should be fully in accordance with relevantstandards

Page 4 - 1.0 Introduction

7.0 Site Requirements127.1 Information1. The installation must be carried out by a CORGIRegistered Installer or other registered competentperson and b

Page 5 - 2.0 General Layout

7.0 Site Requirements137.5 Ventilation of Compartments1. Where the appliance is installed in a cupboardor compartment, no air vents are required.2. BS

Page 6 - 3.0 Appliance Operation

7.0 Site Requirements14Fig. 167.8 Flue1. The flue terminal position must be inaccordance with the current editions of B.S.5440 Part 1, and either Part

Page 7 - 4.0 Technical Data

7.0 Site Requirements157.9 Flue DimensionsThe standard horizontal flue kit allows for fluelengths between 100mm and 1metre from elbowto terminal (Fig.

Page 8 - Dimensions

167.0 Site Requirements7.12 Flue Options1. The Baxi Combi 80Eco can be fitted with fluesystems as illustrated. 2. The standard flue is suitable only f

Page 9

8.0 Installation178.1 Initial PreparationThe gas supply, gas type and pressure mustbe checked for suitability before connection(see Section 7.6).1. Af

Page 10 - 6.0 System Details

8.0 Installation188.4 Fitting The Boiler1. Lift the boiler using the lower edges. Engagethe slots at the top rear of the boiler on the wallplate hooks

Page 11

8.0 Installation198.6 Fitting The FlueHORIZONTAL FLUE1. The standard flue is suitable for lengths100mm minimum to 1m maximum (measuredfrom the edge of

Page 12 - 7.0 Site Requirements

2Baxi UK Limited is one of the leading manufacturersof domestic heating products in the UK. Our first priority is to give a high quality service to o

Page 13 - IRING REGULATIONS

8.0 Installation208.6 Fitting the Flue (Cont)IMPORTANT: If the equivalent flue length isgreater than 1.5m the restrictor MUST beremoved from the adapt

Page 14

8.0 Installation218.7 Making The Electrical ConnectionsTo connect the mains input cable proceed asfollows:-1. Slacken the facia securing screws and li

Page 15

9.0 Commissioning the Boiler229.1 Commissioning the Boiler1. Reference should be made to BS 5449 Section5 when commissioning the boiler. 2. Open the m

Page 16

9.0 Commissioning the Boiler239.2 Checking the Burner Pressure1. Turn on the gas and electrical supplies to theboiler and ensure that all external con

Page 17 - FIXING TEMPLATE

10.0 Completion2410.1 Completion1. Hinge the facia panel upwards and refit thecase front panel. Secure them with the screwspreviously removed (Fig. 45

Page 18 - 4 in valve with

11.0 Servicing the Boiler2511 .1 Annual Servicing1. For reasons of safety and economy, it isrecommended that the boiler is serviced annually.Servicing

Page 19 - 8.0 Installation

11.0 Servicing the Boiler2611.1 Annual Servicing (Cont)10. Remove the spring clips retaining the air boxside baffle plates. Disengage the tabs on theb

Page 20

12.0 Changing Components27IMPORTANT: When changing componentsensure that both the gas and electricalsupplies to the boiler are isolated before anywork

Page 21

12.0 Changing Components2812.3 Heat Exchanger (Fig. 62)1. Note the positions of the two sensing tubes onthe outlet elbow and three wires on the fan mo

Page 22 - 9.0 Commissioning the Boiler

12.0 Changing Components2912.5 Injectors (Fig. 64)1. Remove the burner as described in Section12.4.2. Undo the screws securing the injectormanifold to

Page 23

31.0 Introduction 42.0 General Layout 53.0 Appliance Operation 64.0 Technical Data 75.0 Dimensions and Fixings 86.0 System Details 97.0 Site Requireme

Page 24 - 10.0 Completion

12.0 Changing Components3012.8 Gas Valve (Fig. 66)1. Undo the nut on the gas feed pipe at the tap railunder the boiler.2. Remove the securing screws a

Page 25 - 11.0 Servicing the Boiler

12.0 Changing Components3112.11 Pump - Head Only (Figs. 68 & 69)1. Drain the primary circuit and remove thesocket head screws securing the pump he

Page 26

12.0 Changing Components3212.14 Pressure Gauge 1. Drain the primary circuit and undo the nut onthe pressure gauge capillary (Fig. 71).2. Remove th

Page 27 - 12.0 Changing Components

12.0 Changing Components3312.17 Pressure Relief Valve (Fig. 78)1. Drain the primary circuit.2. Disconnect the discharge pipe from the valve.Using a su

Page 28

12.0 Changing Components3412.20 Plate Heat Exchanger (Fig. 81)1. Drain the primary circuit.2. While supporting the heat exchanger undo thescrews secur

Page 29

12.0 Changing Components3512.21 Diverter Valve Assembly (Cont)Pressure Differential Valve (Fig. 84)1. Remove the pressure differential valve asdescrib

Page 30

13.0 Illustrated Wiring Diagram36Optional TimersPumpGas ValveAir Pressure SwitchSafety ThermostatHydraulic DifferentialPressure SwitchTemperature Sens

Page 31

14.0 Fault Finding37Carry out initial fault finding checks1. Check that gas, water and electrical supplies are available at the boiler. Electrical sup

Page 32

14.0 Fault Finding38Domestic Hot Water - Follow operational sequenceTurn selector to neon illuminatedPrimary flow switchoperatedFan runs at max sp

Page 33

14.0 Fault Finding39Fault Finding Solutions Sections A to EIs there 230V at:Is there 230V at:Main terminals L and N Check electrical supply1.NOMain te

Page 34

Baxi UK Limited declare that no substancesharmful to health are contained in theappliance or used during appliancemanufacture.1.1 Description1. The Ba

Page 35

14.0 Fault Finding40Check and correct if necessary1. Electrical and pressure tube connections2. Blockage of pressure tubes3. Restriction in flue4. Ven

Page 36 - Control PCB

14.0 Fault Finding41Check and correct if necessary1. Flame sensing electrode and lead connections2. Electrode positionFlame current should be 1 µA app

Page 37 - 14.0 Fault Finding

15.0 Short Parts List42Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.22 E66 383 Fan 24800123 393-497 Pressure Switch 2

Page 38

43Baxi UK Limited manufacture a comprehensive rangeof products for the domestic heating market.Gas Central Heating Boilers(Wall, Floor and Fireside mo

Page 39

Baxi UK LimitedBrownedge RoadBamber Bridge PrestonLancashirePR5 6SNwww.baxi.comAfter Sales Service08706 096 096Technical Enquiries08706 049 049Comp No

Page 40

2.0 General Layout52.1 Layout1. Air Pressure Switch2. Expansion Vessel3. Burner Manifold4. Automatic Air Vent5. DHW Plate Heat Exchanger6. Circulation

Page 41

3.0 Appliance Operation6NOTE: All delay timers mentioned in 3.1 and3.2 are overridden by domestic hot waterdemand.3.1 Central Heating Mode (Fig. 4)1.

Page 42 - 15.0 Short Parts List

4.0 Technical Data7Flue Terminal Diameter 100mmDimensions Projection 95mmOutercase DimensionsCasing Height - 780mmOverall Height Inc FlueElbow - 980mm

Page 43

5.0 Dimensions and Fixings8DimensionsA 780mmB 345mmC 450mmD 107mm Ø Min.E 200mmF 190mmG 143mm360° Orientation Tube Ø 100mmDCBAEGF65mm 65mm 65mm 65mmWa

Page 44 - 08706 049 049

6.0 System Details96.1 Information1. The Baxi Combi 80Eco Combination Boiler is a‘Water Byelaws Scheme - Approved Product’.To comply with the Water By

Comments to this Manuals

No comments