Baxi TS Super Service Manual

Browse online or download Service Manual for Fireplaces Baxi TS Super. Baxi TS Super Technical data User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Baxi Bermuda Inset 3 Super
Fireside Gas Central Heating Units
Installation and
Servicing Instructions
Please leave these instructions with the user
TS, BS, KS
& SC Super
FS, BB, CB
& BC Super
Page view 0
1 2 3 4 5 6 ... 31 32

Summary of Contents

Page 1 - Baxi Bermuda Inset 3 Super

Baxi Bermuda Inset 3 SuperFireside Gas Central Heating UnitsInstallation and Servicing InstructionsPlease leave these instructions with the userTS, BS

Page 2 - Natural Gas

1.0 Introduction104 Pin Electrical Plug3 Pin Electrical PlugMains Inlet Cable ClampMains Inlet CableBoiler BaseFire Cable ClampInlet PlugCutoutsFig. 1

Page 3 - Contents

5.0 Installation115.4 Fitting the Fire1. Remove the fire surround trim from its polybag (Fig. 11). The fire surround should behandled with care.2. Pos

Page 4

5.0 Installation125.4 Fitting the Fire (continued)7. Fit the fire gas supply pipe at the motorisedvalve inlet (Fig. 18).8. Fit the fire gas supply pip

Page 5 - 2.0 Technical Data

6.0 Commissioning the Fire136.1 Commissioning the Fire1. Turn on the main gas and electrical supply andpress the button (Fig. 24) to check that

Page 6 - 3.0 Site Requirements

7.0 Arranging the Coals147.1 Arranging the CoalsIt is important that all the coals are used andarranged as shown in order to achieve thedesired flame

Page 7

7.0 Arranging the Coals157.1 Arranging the Coals (cont)7. At this point it is necessary to fit the fenderassembly. 8. Remove the fender from its packi

Page 8 - 4.0 Electrical

8.0 Checking for Spillage168.1 Checking for SpillageCAUTION - Whilst checking for spillage caremust be taken to avoid touching hot panels. 1. Before c

Page 9

8.0 Checking for Spillage178.4 Completion1. Take the black painted extension piece,captive nut and screw from the fire contents kit.2. Fit the captive

Page 10 - 1.0 Introduction

9.0 Annual Servicing189.1 Annual ServicingIMPORTANT: It is possible that some sootmay be deposited on the coals after use. Thisis acceptable providing

Page 11 - 5.0 Installation

9.0 Annual Servicing199.2 Preparation (Cont)8. Slacken the two screws inside the flue spigot(Fig. 46).9. Disconnect the electrical plug from the socke

Page 12

2Baxi is one of the leading manufacturers of domesticheating products in the UK. Our first priority is to give a high quality service to ourcustomers

Page 13 - 6.0 Commissioning the Fire

9.0 Annual Servicing209.5 Cleaning the Combustion Box & Coals1. Remove any deposits from the firebed basepanel (Fig. 52).2. If necessary the coals

Page 14 - 7.0 Arranging the Coals

10.0 Changing Components2110.1 Changing ComponentsWARNING: Isolate the gas and electricitysupplies to the boiler and fire unit beforechanging any comp

Page 15

2210.0 Changing Components10.1 Changing Components (continued)9. Remove the two screws retaining the sides ofthe fire combustion box to the fire base

Page 16 - 8.0 Checking for Spillage

10.0 Changing Components2310.3 Pilot/A.S.D. AssemblyNOTE: The thermocouple cannot be changedas an individual component. The completeassembly must be r

Page 17

10.0Changing Components2410.4 Control Box1. Disconnect the earth point.2. Remove the control box heat shield retainingscrew and place the shield to on

Page 18 - 9.0 Annual Servicing

10.0 Changing Components2510.6 Control Panel1. Disconnect the control panel connector fromthe front of the valve bracket (Fig. 79).2. Lift the surrou

Page 19

10.0 Changing Components2610.7 BulbsIMPORTANT: Only replace the bulb/s with a 12V20W halogen capsule bulb available at most DIYoutlets, specialist ele

Page 20

11.0 Fault finding27Doesthe pilotlight ?Doesthe mainburnerlight ?Aregas cocksfully open ?Ispilot burnerclean ?Is flueblocked causingA.S.D. tooperate ?

Page 21 - 10.0 Changing Components

12.0 Flow Charts28IGNITIONPress ON button & hold for aminimum of 3 secondsON neon activatedStart gas to pilotstart sparkSystem is resetON neon dea

Page 22

12.0 Flow Charts29ELECTRICITYOFFGAS OFFSTART IGNITIONSEQUENCEGas closedON neon de-activatedSystem is resetPress ON buttonSafety lock out Press OFFbut

Page 23

31.0 Introduction 42.0 Technical Data 53.0 Site Requirements 64.0 Electrical 85.0 Installation 96.0 Commissioning the Fire 137.0 Arranging the Coals 1

Page 24 - 10.0Changing Components

13.0Short parts list30Short Parts ListKey G.C. Description ManufacturersNo. No. Part No.4 E37 182 Switch Control Panel 2463585 E37 183 Decal Controls

Page 25

Baxi manufacture a comprehensive range ofproducts for the domestic heating marketGas Central Heating Boilers(Wall, Floor and Fireside models).Independ

Page 26

Comp No 247852 - Iss 5 - 1/03BAXI POTTERTONBrownedge Road Bamber Bridge Preston Lancashire PR5 6SNAfter Sales Service 08706 096 096 Technical Enquirie

Page 27 - 11.0 Fault finding

1.0 Introduction4 11.1 Description1. Your Baxi Bermuda Inset 3 Super is a centralheating boiler combined with a gas fire. Thefirefront is of the Decor

Page 28 - Control System

2.0 Technical Data1 5Bermuda Inset 3 TS, BS, FS, KS SuperBermuda Inset 3 BB, CB, SC, BC SuperThe fire is set for Gas Type G20 at 20mbar.Heat Input (Gr

Page 29 - SEQUENCE

3.0 Site Requirements6 13.1 Fireplace Opening1. The principal site requirements are determinedby the boiler unit, but the following details areessenti

Page 30 - 13.0Short parts list

3.0 Site Requirements1 73.3 Ventilation1. Ventilation air supply should be in accordancewith the relevant standards. In GB this is BS5440 Pt 2. In IE

Page 31

4.0 Electrical84.1 Electrical Supply1. Electricity is supplied to the fire unit via the plugand cable assembly provided with the fire.2. The cable mus

Page 32 - 247852 - Iss 5 - 1/03

5.0 Installation95.1 Initial Preparation1. Unpack the fire unit from the carton. The coalbed and fender assemblies are packed inindividual boxes withi

Comments to this Manuals

No comments