Baxi TS Super Installation Manual

Browse online or download Installation Manual for Fireplaces Baxi TS Super. Baxi TS Super Unit installation [en] User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Baxi Bermuda
Inset 2 Boiler 50/4 E
Fireside Gas Central Heating Unit
Installation and
Servicing Instructions
Please leave these instructions with the user
Page view 0
1 2 3 4 5 6 ... 31 32

Summary of Contents

Page 1 - Inset 2 Boiler 50/4 E

Baxi Bermuda Inset 2 Boiler 50/4 EFireside Gas Central Heating UnitInstallation and Servicing InstructionsPlease leave these instructions with the use

Page 2 - Natural Gas

4.0 Site Requirements10 14.5 Flue1. The flue installation must conform to BS 5440 Pt 1. The flue must have a minimumvertical height of 3m (10ft) and h

Page 3 - Contents

4.0 Site Requirements1 114.6 Ventilation1. Ventilation air supply to BS 5440 Pt 2 isrequired. The permanent ventilation area sizerequirements are as s

Page 4 - 1.0 Introduction

5.0 Electrical12Main Gas ValvePilot Gas ValveThermostat SensorControlPotentiometer& SwitchSpark ElectrodeNNExternalControlsS/LL230VLbrborppor/bkr/

Page 5 - 2.0 Technical Data

6.0 Installation136.1 Initial Preparation1. Remove the outer carton from the boiler pack.Discard the packing pieces. Remove the boilerhood and fitting

Page 6 - 3.0 System Details

6.0 Installation146.3 Connecting the Sensing Pipe1. Remove the protection cap from the sensingpipe adaptor on the burner mounting plate.Slacken the sc

Page 7

6.0 Installation156.7 Water Connections1. The boiler has one return and two flowtappings, Rc1 (1in BSP). The flows are the twoupper tappings. The retu

Page 8

6.0 Installation166.9 Pumped Heating & Gravity Hot Water (Fig. 17)1. A 1in x 22mm threaded adaptor, twocompression nuts and olives and a brass inj

Page 9

6.0 Installation176.11 Electrical Connection1. The appliance requires an electrical supplyfrom the heating controls system.2. A permanent live supply

Page 10 - 4.0 Site Requirements

7.0 Commissioning the Appliance187.1 Commissioning the Appliance1. Reference should be made to BS 5449 section 5when commissioning the boiler and syst

Page 11

8.0 Annual Servicing198.1 Annual Servicing1. To perform annual servicing of the back boilerit is necessary to remove the firefront. 2. After servicing

Page 12 - 5.0 Electrical

2Baxi UK Limited is one of the leading manufacturersof domestic heating products in the UK. Our first priority is to give a high quality service to o

Page 13 - 6.0 Installation

8.0 Annual Servicing208.4 Cleaning the Lint Arrestor1. Remove the lint arrestor from its retaining clipson the burner mounting plate and clean away an

Page 14

8.0 Annual Servicing218.7 Cleaning the Heat Exchanger1. Remove the top and the centre baffles fromthe heat exchanger, noting their orientation(Fig. 43

Page 15

9.0 Changing Components229.1 Changing Components1. To change any components on the back boilerit is necessary to remove the fire front.2. After changi

Page 16

9.0 Changing Components239.6 Printed Circuit Board 1. Remove the controls heat shield from itsretaining clips. 2. Undo the two screws retaining the va

Page 17

9.0 Changing Components249.8 Gas Valve1. Remove controls heat shield (Fig. 58).2. Remove the screws holding the valve coverassembly to the controls mo

Page 18

9.0 Changing Components259.10 Pilot/A.S.D. AssemblyWARNING: The Pilot/A.S.D. Assembly shouldnot be adjusted in anyway. The A.S.D. mustnot be altered s

Page 19 - 8.0 Annual Servicing

10.0Fault Finding26Before starting FAULT FINDING carry outpreliminary electrical system checks i.e. EarthContinuity, Polarity, Short Circuit and Resis

Page 20

10.0Fault Finding27WARNING: Where practicable fault findingshould be performed with the main electricitysupply ISOLATED.Ispilot/ASDassembly,sensingtub

Page 21

2810.0Fault FindingCheck solenoidleads for continuityReplace P.C.B.Does“Boiler On”neon light ?Isresistanceacross sensor correct ?(1M OHM @ 25oC)Arepot

Page 22 - 9.0 Changing Components

2911.0 Short parts listShort Parts ListKey G.C. Description ManufacturersNo. No. Part No.39 E02-416 Burner 23865260 378 882 Injector B19 23401451 E00-

Page 23

31.0 Introduction 42.0 Technical Data 53.0 System Details 6Water Circulating SystemsTreatment of Water Circulating SystemsPipeworkSystem ControlsFully

Page 24

3012.0Notes

Page 25

31Baxi UK Limited manufacture a comprehensiverange of products for the domestic heating marketGas Central Heating Boilers(Wall, Floor and Fireside mod

Page 26 - 10.0Fault Finding

Baxi UK LimitedBrownedge RoadBamber Bridge PrestonLancashirePR5 6SNwww.baxi.comThe Baxi HelplinesFor General Enquiries+44 (0)8706 060 780For After Sal

Page 27

1.0 Introduction4 1STANDARDB.S. 6891B.S. 5546B.S. 5449B.S. 6798B.S. 5440: Pt 1B.S. 5440: Pt 2B.S. 5871: Pt 1B.S. 6500SCOPEGas Installation.Installatio

Page 28

2.0 Technical Data1 5Bermuda Inset 2 Boiler 50/4 EThe Boiler is for use with Natural Gas only.Heat Input Max Mid MinkW 18.79 17 15.2Btu/h 64,100 58,07

Page 29 - 11.0 Short parts list

3.0 System Details6 13.1 Water Circulating Systems1. The appliance is suitable for open ventedsystems which are either fully pumped or pumpedcentral h

Page 30 - 12.0Notes

3.3 Pipework1. The sizes of the flow and return pipes from theboiler should be determined by normal methodsaccording to the requirements of the system

Page 31

3.0 System Details8 13.6 Storage Systems1. For information regarding the use of aBermuda Inset 2 boiler with a storage system,contact the appropriate

Page 32 - The Baxi Helplines

4.0 Site Requirements94.1 Builders Opening (Fig. 5)1. The boiler unit is designed to fit within astandard builders opening, the minimumdimensions of w

Comments to this Manuals

No comments